In Romania, you can build on building land (intervilan) but also on non-building land (extravilan).
The plot of land determines which infrastructure is provided by the municipality and whether you can build in solid construction or mobile construction (log house, timber frame construction, etc.). The size of the development is not affected by this.
You can therefore choose a dream plot in a particularly beautiful location (e.g. on the outskirts of a village) to build a new house.
Many Clients have already fallen in love with a fantastic plot of land in Romania, but have not been able to decide to buy it.
After all, a ready-to-occupy property is usually required and only very few can manage a new build themselves in terms of time and logistics.
This is exactly where our construction services come in, allowing you to implement any construction project in Romania in a stress-free and transparent manner.
Your advantages with a new build in Romania
- Quick success in your real estate search, as undeveloped plots are also possible.
- Dream plots in top locations can be developed for you through a building project.
- No hidden building defects! A new turnkey building built to Western European standards gives you more security than an already "renovated" property.
- Unlike a refurbishment, you are free to plan the layout of the building and do not have to make any compromises.
- Transparency and full cost control through daily photo/video material from the construction site and weekly reports and cost statements.
Properties available immediately on rumaenien.immo.
Examples for new buildings in Romania
A timber construction with point foundations can also be realized in the form shown below on an out-of-town (extravilan) plot.
-
01 erdarbeiten 01
-
01 erdarbeiten 02
-
01 erdarbeiten 03
-
01 erdarbeiten 04
-
01 erdarbeiten 05
-
01 erdarbeiten 06
-
01 erdarbeiten 07
-
01 erdarbeiten 08
-
01 erdarbeiten 09
-
01 erdarbeiten 10
-
01 erdarbeiten 11
-
02 holzarbeiten 01
-
02 holzarbeiten 02
-
02 holzarbeiten 03
-
02 holzarbeiten 04
-
02 holzarbeiten 05
-
02 holzarbeiten 06
-
02 holzarbeiten 07
-
02 holzarbeiten 08
-
02 holzarbeiten 09
-
02 holzarbeiten 10
-
02 holzarbeiten 11
-
02 holzarbeiten 12
-
02 holzarbeiten 13
-
02 holzarbeiten 14
-
02 holzarbeiten 15
-
02 holzarbeiten 16
-
02 holzarbeiten 17
-
02 holzarbeiten 18
-
02 holzarbeiten 19
-
02 holzarbeiten 20
-
02 holzarbeiten 21
-
02 holzarbeiten 22
-
03 dach 01
-
03 dach 02
-
03 dach 03
-
03 dach 04
-
03 dach 05
-
03 dach 06
-
03 dach 07
-
03 dach 08
The example shows a solid construction with a conservatory (as a connection to the existing old building) using ecological construction methods. A floor slab was dispensed with and instead a "suspended", insulated wooden floor was installed. Only softwood insulation materials and clay plasterboards with clay were used throughout the building. The interior plaster on the solid exterior walls is also finished with clay plaster.
-
01 abriss 01
-
01 abriss 02
-
01 abriss 03
-
01 abriss 04
-
01 abriss 05
-
01 abriss 06
-
01 abriss 07
-
02 versorgung 01
-
02 versorgung 02
-
02 versorgung 03
-
02 versorgung 04
-
02 versorgung 05
-
02 versorgung 06
-
03 fundament 01
-
03 fundament 02
-
03 fundament 03
-
03 fundament 04
-
03 fundament 05
-
04 mauern 01
-
04 mauern 02
-
04 mauern 03
-
04 mauern 04
-
04 mauern 05
-
04 mauern 06
-
04 mauern 08
-
04 mauern 09
-
04 mauern 10
-
04 mauern 11
-
04 mauern 12
-
05 dach 01
-
05 dach 02
-
05 dach 03
-
05 dach 04
-
05 dach 05
-
05 dach 06
-
05 dach 07
-
05 dach 08
-
06 boden 01
-
06 boden 02
-
06 boden 03
-
06 boden 04
-
07 decken 02
-
07 decken 03
-
07 decken 04
-
07 decken 05
-
08 innen 01
-
08 innen 02
-
08 innen 03
-
08 innen 04
-
08 innen 05
-
08 innen 06
-
08 innen 07
-
08 innen 08
-
08 innen 09
-
06 boden 05
-
06 boden 06
-
06 boden 07
-
06 boden 08
-
06 boden 09
-
07 decken 01
Vereinbaren Sie jetzt ein kostenloses und unverbindliches Erstgespräch.
Building in Romania - Overview